Lumen Designer Interior Project Gallery

Interior Projects' Gallery

Lumen Designer allows you to create projects with speed, ease, and confidence. Check out some of the projects below for either Indoor, Exterior, or Daylighting projects:

Finelite Office Rendering
Finelite Rendering
Time to build: 60-90 minutes
Time to calculate: 10 minutes
Quality Setting: High
Rendering: Hybrid
Lumen Designer rendering of Series 15 produced for Finelite, Inc. The Series 15 double diffusing optical system is patent pending.
Swimming Pool Rendering
Swimming Pool
Time to build: 60-90 minutes
Time to calculate: ~10 minutes
Quality Setting: Standard Settings
Rendering: Hybrid
Note: All geometry except for lounge chairs and bench created in Lumen Designer.
Subway Daylighting Rendering
Open Office
Note: All geometry created in Lumen Designer.

Museum Rendering

Museum Chair Rendering

Museum Space
Time to build: 20-30 minutes
Time to calculate: ~8 minutes
Quality Setting: Fast Settings
Rendering: Hybrid

Ferrari Rendering

Ferrari Rendering

Auto Show Display
Time to build: 30-45 minutes
Time to calculate: 3 minutes
Quality Setting: Fast Settings
Rendering: Hybrid(1), Radiosity(2)
Note: Ferrari model imported from DWG, mountain photo applied to curved wall (created in Designer by extruding an arc), mirrors added in Designer
Smoking Area Rendering
Waiting Area
Time to build: 5-10 minutes
Time to calculate: 1 minute
Quality Setting: Fast Settings
Rendering: Hybrid
Note: Furniture imported via DWG from manufacturer with materials applied in Designer, everything else built in Designer
Open Office Rendering
Simple Open Office
Time to build: 30-45 minutes
Time to calculate: 1.5 minutes
Quality Setting: Fast
Rendering: Hybrid
Note: Built entirely in Designer, matte columns, polished floor
Warehouse Rendering
Warehouse
Time to build: 10 minutes
Time to calculate: 10 minutes
Quality Setting: Fast
Rendering: Hybrid
Notes: Large space (600'x800'); sloped ceiling
Two-Story Rendering
Spiral Staircase
Time to build: 45 minutes
Time to calculate: 3 minutes
Quality Setting: Fast
Rendering: Hybrid
Notes: Spiral staircase, moose head and other objects imported via DWG; second floor and railing created in Designer
Conference Room Rendering
Conference Room
Time to build: ~30 minutes
Time to calculate: 3.5 minute
Quality Setting: High
Rendering: Radiosity
Lamp Color Rendering
Lamp Color (Gels) Example
Time to build: ~5 minutes
Time to calculate: <1 minute
Quality Setting: High
Rendering: Hybrid

 

 

 

 

© Copyright 2006. All Rights Reserved. Lighting Technologies Inc.